Home / Featured projects / Ninh Co River Improvement – Nam Dinh (Sub-component A2)

Channels, revetments and coastal protection

Ninh Co River Improvement – Nam Dinh (Sub-component A2)

Supplementary survey and construction design for the protection dyke of the northern dredged-material area and the northern breakwater.

Whole-project scale and key parameters

Components
Protection dyke Km 0+000 – Km 1+339 with bank protection; breakwater Km 0+000 – Km 0+050

This is the scale of the whole project, not of VPCC’s contract. VPCC’s own scope is set out below.

VPCC role and scope of work

  • Supplementary topographic and geotechnical survey
  • Construction design for Contract CV-A2.1-NDTDP: protection works for the northern dredged-material area and the northern breakwater

Consulting and technical solutions delivered

  • Design of the dredged-material protection dyke and breakwater

Highlights

  • Part of Sub-component A2 of the Ninh Co River improvement

Progress and results

VPCC involvement: 2014.