Hon La International General Port
EPC contractor for Hon La International General Port, with a 1,030 m quay for vessels up to 100,000 DWT.

General/Container Berths 4 and 5 – VSICO Chan May Port
A 540 m quay for 70,000 DWT vessels and container ships up to 4,000 TEU; VPCC builds the marine works and yard pavements.

Nam Dinh Vu Port – Phase 3
Three berths for vessels up to 30,000 DWT on 22.5 ha; VPCC has been the port’s consultant since 2013.

Song Lam International Port
Terminal Area 1 has seven berths over 1,144 m; Terminal Area 2 has two berths over 300 m for vessels up to 100,000 DWT. VPCC has been involved from design and construction to port declaration and AI camera advisory.

Coal Import Port and Breakwater – Quang Trach Power Centre
A 300 m quay for vessels up to 100,000 DWT; VPCC supports management of the EPC contract for the coal port and breakwater.
Local Inland Waterway Channel Survey – Ninh Binh
Survey and economic-technical report supporting management and notification of local inland waterway channels.

Container Terminal No. 2 – Nghi Son Port
Four berths totalling 1,380 m for vessels up to 100,000 DWT; VPCC continues to advise on expansion berths up to 200,000 DWT.
Cai Mep Gemadept Terminal Link Port
A 1,060 m quay for vessels up to 200,000 DWT on 33 ha; VPCC advised on site, turning basin approvals and project management.

Nghi Son Iron and Steel International General Port
Six berths totalling 1,497 m for vessels from 20,000 to 100,000 DWT; VPCC provided design and supervision consulting and built several components.
Anti-erosion Revetment at Mui Ranh, An Bien
Construction of a coastal anti-erosion revetment at Mui Ranh, An Bien District, Kien Giang Province.

Van Phong International Port – Phase 1
Two berths totalling 184 m for vessels up to 50,000 DWT, built by VPCC under an E&C arrangement.

My Thuy International Port
A 3,300 m quay for vessels up to 100,000 DWT on 995 ha; VPCC provided consulting from survey to project management.

Hoanh Son International General Port
A 330 m berth for vessels from 40,000 DWT to 4,000 TEU, later extended by 148 m (phase 2).

Vinh Tan General Port
Three berths totalling 550 m for vessels from 3,000 to 30,000 DWT on 141.2 ha.
Ninh Co River Improvement – Nam Dinh (Sub-component A2)
Supplementary survey and construction design for the protection dyke of the northern dredged-material area and the northern breakwater.

Chu Lai Float Glass Plant
A 700 t/day plant on 100 ha in the Chu Lai Open Economic Zone; one of VPCC’s first projects.