Home / Featured projects / Van Phong International Port – Phase 1
Seaports and terminalsVan Phong International Port – Phase 1
Two berths totalling 184 m for vessels up to 50,000 DWT, built by VPCC under an E&C arrangement.

Whole-project scale and key parameters
- Berths
- 02
- Total length
- 184 m
- Vessel size
- Up to 50,000 DWT
- Area
- 20 ha
- Form
- E&C
VPCC role and scope of work
- Construction of the berth and approach trestle (package XL-01), initial phase of Bac Van Phong General Port (2017)
- Construction of the revetment combined with a service berth (2018)
- Construction of Berth 2 and upgrade of Berth 1, phase 1 (2022)
- Verification of the design to upgrade Berth 1 for 100,000 DWT vessels (2022)
Consulting and technical solutions delivered
- Construction under an E&C arrangement
- Design verification for a berth upgrade to larger vessels
Highlights
- Several phases with the same client from 2017 to 2022
Progress and results
VPCC involvement: 2017 – 2022.
Talk to us about your port project
Tell us the type of port, its location and the project stage. VPCC will reply with a suggested way to work together.