Each project states the whole-project scale separately from VPCC’s actual scope of work.

Hon La International General Port
Seaports and terminals

Hon La International General Port

EPC contractor for Hon La International General Port, with a 1,030 m quay for vessels up to 100,000 DWT.

Central Vietnam · 2025 · Survey, Design, EPC contractor
General/Container Berths 4 and 5 – VSICO Chan May Port
Seaports and terminals

General/Container Berths 4 and 5 – VSICO Chan May Port

A 540 m quay for 70,000 DWT vessels and container ships up to 4,000 TEU; VPCC builds the marine works and yard pavements.

Central Vietnam · 2024 · Construction
Nam Dinh Vu Port – Phase 3
Seaports and terminals

Nam Dinh Vu Port – Phase 3

Three berths for vessels up to 30,000 DWT on 22.5 ha; VPCC has been the port’s consultant since 2013.

Northern Vietnam · 2024 · Survey, Design, Supervision, Inspection
Song Lam International Port
Dedicated terminals

Song Lam International Port

Terminal Area 1 has seven berths over 1,144 m; Terminal Area 2 has two berths over 300 m for vessels up to 100,000 DWT. VPCC has been involved from design and construction to port declaration and AI camera advisory.

Central Vietnam · 2023 · Survey, Design, Supervision, Project management, Construction, Regulatory support
Coal Import Port and Breakwater – Quang Trach Power Centre
Dedicated terminals

Coal Import Port and Breakwater – Quang Trach Power Centre

A 300 m quay for vessels up to 100,000 DWT; VPCC supports management of the EPC contract for the coal port and breakwater.

Central Vietnam · 2021 · Project management
Channels, revetments and coastal protection

Local Inland Waterway Channel Survey – Ninh Binh

Survey and economic-technical report supporting management and notification of local inland waterway channels.

Northern Vietnam · 2021 · Survey
Container Terminal No. 2 – Nghi Son Port
Seaports and terminals

Container Terminal No. 2 – Nghi Son Port

Four berths totalling 1,380 m for vessels up to 100,000 DWT; VPCC continues to advise on expansion berths up to 200,000 DWT.

Central Vietnam · 2020 · Design, Survey, Investment advisory
Seaports and terminals

Cai Mep Gemadept Terminal Link Port

A 1,060 m quay for vessels up to 200,000 DWT on 33 ha; VPCC advised on site, turning basin approvals and project management.

Southern Vietnam · 2020 · Project management, Maritime approvals
Nghi Son Iron and Steel International General Port
Seaports and terminals

Nghi Son Iron and Steel International General Port

Six berths totalling 1,497 m for vessels from 20,000 to 100,000 DWT; VPCC provided design and supervision consulting and built several components.

Central Vietnam · 2018 · Survey, Design, Supervision, Construction
Channels, revetments and coastal protection

Anti-erosion Revetment at Mui Ranh, An Bien

Construction of a coastal anti-erosion revetment at Mui Ranh, An Bien District, Kien Giang Province.

Southern Vietnam · 2018 · Construction
Van Phong International Port – Phase 1
Seaports and terminals

Van Phong International Port – Phase 1

Two berths totalling 184 m for vessels up to 50,000 DWT, built by VPCC under an E&C arrangement.

Central Vietnam · 2017 · Construction, Design verification
My Thuy International Port
Seaports and terminals

My Thuy International Port

A 3,300 m quay for vessels up to 100,000 DWT on 995 ha; VPCC provided consulting from survey to project management.

Central Vietnam · 2016 · Survey, Design, Supervision, Project management
Hoanh Son International General Port
Seaports and terminals

Hoanh Son International General Port

A 330 m berth for vessels from 40,000 DWT to 4,000 TEU, later extended by 148 m (phase 2).

Central Vietnam · 2015 · Survey, Design, Investment advisory
Vinh Tan General Port
Seaports and terminals

Vinh Tan General Port

Three berths totalling 550 m for vessels from 3,000 to 30,000 DWT on 141.2 ha.

Central Vietnam · 2015 · Survey, Design, Supervision, Investment advisory
Channels, revetments and coastal protection

Ninh Co River Improvement – Nam Dinh (Sub-component A2)

Supplementary survey and construction design for the protection dyke of the northern dredged-material area and the northern breakwater.

Northern Vietnam · 2014 · Survey, Design
Chu Lai Float Glass Plant
Plants and infrastructure

Chu Lai Float Glass Plant

A 700 t/day plant on 100 ha in the Chu Lai Open Economic Zone; one of VPCC’s first projects.

Central Vietnam · 2009 · Design, Project management, Construction

Talk to us about your port project

Tell us the type of port, its location and the project stage. VPCC will reply with a suggested way to work together.