Terminal Area 1 has seven berths over 1,144 m; Terminal Area 2 has two berths over 300 m for vessels up to 100,000 DWT. VPCC has been involved from design and construction to port declaration and AI camera advisory.

Song Lam International Port

Whole-project scale and key parameters

Terminal Area 1
7 berths, 1,144 m, vessels up to 70,000 DWT
Terminal Area 2
2 berths, 300 m, vessels up to 100,000 DWT
Area of Terminal Area 1
44.3 ha
Funding
Private

This is the scale of the whole project, not of VPCC’s contract. VPCC’s own scope is set out below.

VPCC role and scope of work

  • Verification of construction design and cost of the approach trestle, the berth for 100,000 DWT vessels and a 3,000 t/h conveyor system; dredging of channel and basin
  • Design and supervision of the 10,000 DWT inland berth, revetments and breakwaters
  • Survey, basic design and construction design for Phase 2 – a four-berth area for 30,000 DWT vessels and Breakwater No. 2
  • Construction of D800 prestressed concrete piles, berths, revetments, breakwaters, dredging and Berths 4, 5, 6 and 7
  • Regulatory files: port declaration, channel declaration, upgrade and declaration of Berths 4, 5 and 6 for vessels up to 70,000 DWT
  • Advice to the port owner on an AI camera system for cargo monitoring (inauguration ceremony in November 2026)

Consulting and technical solutions delivered

  • Design and cost verification of the approach trestle, berth and dedicated conveyor
  • Design and supervision of revetments and breakwaters
  • D800 prestressed concrete piling for the trestle piers
  • Port declaration, channel declaration and vessel-size upgrade files
  • AI camera advisory for cargo monitoring (see the Smart port technology page)

Highlights

  • Involved from 2015 to 2023, from design and construction to operating approvals
  • A port with AI-based cargo monitoring, on which VPCC advised the port owner

Progress and results

VPCC was involved from 2015 to 2023; the AI camera system’s inauguration ceremony is held in November 2026.

Smart port

This port has an AI camera cargo-monitoring system; VPCC is consultant to the port owner. Learn more

Talk to us about your port project

Tell us the type of port, its location and the project stage. VPCC will reply with a suggested way to work together.